Metrolink Logistics Hub
Jalan Raya Kaliabang RT.007/RW.006 Medan Satria, Medan Satria, Bekasi City, West Java 17132, Indonesia
More
Features
- Secure truck loading bays with trucks parking length of 14m
- Fire protection: ESFR (Early Suppression Fast Response) sprinkler system throughout all of the internal space (NFPA13)
- Covered loading bays with dock levelers
- Ample truck parking bays on site
- Separate office facilities and staff parking
- Tenant floor includes room for driver rest area and prayer room facilities
- Integrated environmentally sustainable design include solar panels and has achieved Green Mark Gold Certification from Building & Construction Authority (BCA)


/
Specifications
Structure
Three-level ramp-up warehouse with wide access ramps
GFA (m²)
276,404
NLA (m²)
195,801
Ceiling Height
10m clear ceiling height, suitable for 6-7 tier racking
Floor loading (Per m²)
Ground Floor: 3 tons
Upper Floors: 2.5 tons
High specification floors engineered to FF35 l FL25 standard and overseen by international flooring specialists
Land Area (m²)
125,171
Time of Completion
Warehouses 1 & 2: Q3 2019
Warehouse 3: Q3 2021
Warehouse 4: Q3 2023
Leasing Contact
Haris Gunawan
Haris.Gunawan@esr.com